Utility/search And Recovery Uh-1n Helicopter Parts

End item NSN parts
Filter By: Electrolytic Fixed Capacitors
page 1 of 1
Part Number
NSN
NIIN
095-0003-00 Electrolytic Fixed Capacitor
004820462
153C3220-02-063 Electrolytic Fixed Capacitor
004820462
183-0251-00 Electrolytic Fixed Capacitor
000804136
183-0251-000 Electrolytic Fixed Capacitor
000804136
184-9085-650 Electrolytic Fixed Capacitor
004439242
3186BA292U040AL Electrolytic Fixed Capacitor
010088490
3186BA292U040ALA1 Electrolytic Fixed Capacitor
010088490
600D107040DG4 Electrolytic Fixed Capacitor
004820462
600D107G040DG4 Electrolytic Fixed Capacitor
004820462
86F555L Electrolytic Fixed Capacitor
010088490
CSR13G184KL Electrolytic Fixed Capacitor
012708660
CSR13G184KM Electrolytic Fixed Capacitor
012708660
D31559 Electrolytic Fixed Capacitor
000804136
M39003-01-2103 Electrolytic Fixed Capacitor
012708660
M39003-01-2206 Electrolytic Fixed Capacitor
004439242
M39003-01-2823 Electrolytic Fixed Capacitor
012708660
M39003/01-2343 Electrolytic Fixed Capacitor
012708660
M39003/01-3063 Electrolytic Fixed Capacitor
012708660
M39003/01-3166 Electrolytic Fixed Capacitor
004439242
M39003/01-8172 Electrolytic Fixed Capacitor
012708660
Page:

Helicopter, Utility/search And Recovery Uh-1n

Picture of Utility/search And Recovery Uh-1n Helicopter

The Bell UH-1N Twin Huey is a twin-engine medium military helicopter. A member of the numerous Huey family, it first flew in 1969. The CUH-1N Twin Huey (later CH-135 Twin Huey) was the original version, first ordered by the Canadian Forces.

The UH-1N has a fifteen-seat configuration, with one pilot and fourteen passengers. In cargo configuration it has an internal capacity of 220 ft³ (6.23 m³). An external load of up to 5,000 lb (2,268 kg) can be carried. The UH-1N was later developed into the civil Bell 212.

Based on the stretched fuselage Bell 205, the Bell 212 was originally developed for the Canadian Forces (CF) under the designation CUH-1N Twin Huey. Later the CF adopted a new designation system and the aircraft was re-designated CH-135 Twin Huey.

The US military came very close to not procuring the Twin Huey. The purchase of the aircraft for US military use was opposed by the Chairman of the House Armed Services Committee at the time, L. Mendel Rivers. Rivers took this position because the aircraft powerplant, the Pratt & Whitney Canada PT6T was produced in Canada. The Liberal Canadian government of the time had not supported US involvement in Vietnam and had opposed US policies in southeast Asia, as well as accepting US draft dodgers. Rivers was also concerned that procurement of the engines would result in a trade deficit situation with Canada. Congress only approved the purchase when it was assured that a US source would be found for the PT6T/T400 engines. As a result, the United States military services ordered 294 Bell 212s under the designation UH-1N, with deliveries commencing in 1970.

Σύγκριση τώρα»
Σαφής | Κρύβω